When is a milestone inspection required in Florida?
A milestone inspection is required at 30 years after the certificate of occupancy, or at 25 years when the building is within three miles of the coastline, and every ten years after that. It applies to condominium and cooperative buildings of three stories or more.
The two dates
The clock starts at the certificate of occupancy, not the year the first unit sold. A building within three miles of the coast is inspected five years earlier than one inland — the law assumes salt air and wind-driven rain reach it harder.
How the counties differ
| County | Program | Cycle |
|---|---|---|
| Miami-Dade | County recertification, §8-11(f) | 30 years, or 25 within three miles of the coast, then every ten |
| Broward | Building Safety Inspection Program (BORA 05-05) | 25 years, then every ten |
| Palm Beach | State milestone rule in unincorporated land; cities run their own | 25 years coastal, 30 inland, then every ten |
| Collier | State milestone rule | 25 years within three miles of saltwater, 30 outside, then every ten |
What happens if the date passes
The building official can refer the case to the code board or the unsafe-structure process. A lender or insurer can require the report before renewing. That is why the deadline matters to an owner even before a notice arrives.
Where the deadline is published
Miami-Dade publishes every recertification case since 1996, and Broward publishes its yearly notification list. Palm Beach and Collier publish no bulk list, so a deadline there is calculated from the year built and the county's rule and labelled as calculated.
Updated 2026-11-25. General information about Florida law and county programs, not legal advice; confirm a building's status with the authority having jurisdiction.