StructureRadar

Home › Palm Beach › Juno Beach

Celestial Way 101, Juno Beach

2017 Recertification or milestone deadline year · Condo · 1-unit condo group Passed 2017

Cycle passed 2017; the county publishes no filing list, so no claim either way. Built 1982, on a 25-year cycle , coastal.

Owner or associationJUNO BEACH 101 LLC
Owner mailing addressJUNO BEACH 101 LLC 4060 N HILLS DR APT 5 HOLLYWOOD FL 33021 2430
Year built1982
Cycle25 years
Trades the report will call forConcrete restoration, Roofing, Structural engineer, Waterproofing
Size and units— · 1 units
Folio2843412833
SourcePalm Beach County parcel + property details layer
StatusCycle passed, no filing list

Derived from the public record linked above. Not an official notice — confirm the building's status with the authority having jurisdiction.

Quick answers

When is Celestial Way 101 due for recertification?

The deadline year is 2017, calculated from a 1982 construction year and the 25-year cycle.

What is on record for Celestial Way 101?

Cycle passed 2017; the county publishes no filing list, so no claim either way. Source: Palm Beach County parcel + property details layer.

Who owns the building?

JUNO BEACH 101 LLC.

Get the feed for this ZIP   Look up another address